Re-Restoring The Steam Hammer - Part 6
About this video
Steele continues restoring his 1915 Massey steam hammer by boring out the worn piston valve bore to tighten tolerances after 110 years of use. He fabricates a 3-foot-long boring bar on his lathe, then takes the valve casting to Ben’s workshop to use a horizontal boring machine for the precise work. After careful setup and multiple passes on the bore, Steele discovers the original valve rod has significant pitting that will damage the packing, so he plans to machine an entirely new valve and valve rod.
Key takeaways
- When boring worn historic components, account for accumulated wear and expect to remove significant material to restore proper tolerances and function
- Precise tool setup on large machines requires methodical tramming and shimming; sometimes original manufacturers used simple methods like placing castings directly on the table without spacers for non-critical surfaces
- Pitting and corrosion on parts like valve rods can render them unusable even after boring the bore itself—inspect thoroughly and plan for complete replacement when damage is severe
- Having access to machinery with large spindle bores enabled Steele to fabricate the boring bar himself; without this, he would have faced significant expense and logistics challenges outsourcing the work
Episode details: published May 6, 2026 · 899.8K views · 17:48 long. Summary written by Self Growth Videos from the episode itself. Steele’s machine histories and restoration judgments are his own, told and attributed as his. Heavy machinery and hot metal are dangerous — these pages are commentary and education, not instruction to imitate.
← Previous: The Biggest Power Hammer I’ve Ever Bought: The Giant Pilkington! · Next: Re-Restoring The Steam Hammer! Part 7 →
All Alec Steele videos · Alec Steele profile · Alec Steele Co. (official store)





